Back | Forward

General Info


The General Info tab enables you to define how the system handles equipment unit data.

Detail View

Data in the fields in the Equipment unit setup options section of this tab define general information about the setup options for equipment units. Unless otherwise indicated, these fields are optional.

Require valid associated equipment ID for equipment units

If this field has a check, users must enter a valid equipment ID in the Associated equipment ID field on the Assignments tab of the Data -> Equipment Units -> Fleet Equipment screen.

Require company ID for equipment units

If this field has a check, users must enter a valid company ID in the Company ID field on the Assignments tab of the Data -> Equipment Units -> Fleet Equipment screen.

Require SLA equipment category for equipment units

If this field has a check, users must enter a valid equipment category in the SLA equipment category field on the Classes tab of the Data -> Equipment Units -> Fleet Equipment screen.

Require assigned mobile shop for equipment units

If this field has a check, users must enter a valid location ID in the Assigned mobile location field on the Locations tab of the Data -> Equipment Units -> Fleet Equipment screen.

Require preferred PM shift for equipment units

If this field has a check, users must enter a valid shift in the Preferred PM shift field on the Locations tab of the Data -> Equipment Units -> Fleet Equipment screen.

Require valid equipment planning project in equipment authorization ID

If this field has a check, users must enter a valid equipment planning project ID in Authorization ID fields.

Require class type for equipment classes

If this field has a check, users must enter a valid class type in the Class type field on the Basic Info tab of the Data -> Equipment Units -> Setup -> Equipment Classes -> Primary Information screen.

Default authorization checkboxes when equipment changes from or to active status

If this field has a check, the Work orders, Usage tickets, and Fuel tickets fields on the Authorization tab of the Asset Primary, Fleet Equipment, Linear Asset (not Fuel tickets), Rail Equipment, Stationary Equipment, and Components - Primary screens are automatically checked whenever equipment status changes to ACTIVE. If the equipment status changes to a value other than ACTIVE, the checks are automatically removed. Checking this option also disables the Exclude from inventory lists option on the Authorization tab of the mentioned screens above.

Meter validation NO EQ UPD also applies to meter readings within edit range

If this field has a check, the meter validation NO EQ UPD also applies to meter readings within edit range. If this field is blank (the default), the system updates the equipment meter readings if the reading is within edit range, even if the user specifies NO EQ UPD in the corresponding meter validation field.

Automatically build equipment subsystem data from template

If this field has a check, a subsystems and parts entry for an equipment type of a maintenance class may be specified as a template. You can use the template to generate records for equipment units in the class. This field is used in conjunction with the Template for equipment subsystems field on the Data -> Equipment Units -> Equipment - Attributes screen.

Require work order ID when entering meter replacement data

If this field has a check, a work order ID is required to replace a meter on the Fleet Equipment, Rail Equipment, Stationary Equipment, and Components screens.

Restart warranty periods based on equipment type defaults when equipment changes to active status

This option allows you to configure warranty periods based on equipment type defaults. If this checkbox is checked, the expiration date and Meter 1 expiration on the Fleet Equipment screen, Warranty tab are reset based on the associated equipment type's Equipment Types screen, Warranty tab values when the equipment type default's equipment is given an ACTIVE life cycle status (See the Fleet Equipment screen, Status tab).

Do not allow overlap of replaces and replaced by warranty

If this field is blank, you may have duplicate values for the Replaced by equipment ID and the Replaces equipment ID fields on the Replacement/Disposition tab of the Data -> Equipment Units -> Fleet Equipment screen.

Allow service request found on work order equipment to be different than current equipment

Check this box to allow a service request found on a work order ID to be able to apply to a different asset than the asset listed on the original service request.

For example: A tree falls down on a track. The maintenance team goes to clear the tree and discovers another asset has been damaged. This team would then open a new service request for the damaged asset and still want the service request linked to the original work order it was found on.

Require valid lease on usage tickets for leased equipment

Check this box to require that any asset that has an Ownership of LEASED has a Lease expiration date value, and that the entered value is not expired based on the current date and time when a user creates a usage ticket for the asset.

Usage tickets created from the following screens will compare the Lease expiration date to the ticket's Transaction date, rather than the current date and time:

Require in service date when equipment unit becomes active

For example, Asset A was acquired and in-service on 01/01/20XX. It was assigned to PM program A, which has services 1, 2 (blank), 3 (blank), 4, and 5 (blank), with every service in an interval of 1 month. When the record is created for Asset A, the System will assign Asset A to PM Service number 4 with a PM due date of 04/01/20xx.

Automatically start class PM schedule when equipment unit becomes active

Select an option here to start the class PM schedule when an equipment unit become active This option applies to both class and individual PM schedules. This field has a choice-list with the following options:

Default work order status due for services/inspections

Select an option here to indicate the preferred status when generating new PM work orders. This field has a choice-list with the following options: