Back | Forward

Projected excess of meter PM override


The application uses the daily average meter usage from the last preventive maintenance (PM) start date to the date of the latest meter reading to project an excess of meter PM override. (The formula for daily average meter usage is [Current meter 1 reading – Meter 1 reading at last PM]/number of days since last PM.) it then determines whether the equipment unit's meter will exceed the override amount before the PM Date due specified on the Data -> Equipment Management -> Equipment Due for Service/Inspection screens (either by Equipment or by Location). (These units may show as TO BE in the MI/Hr Late column on the EQ PM/INSPECTION report because they are not yet late based on meter override, but will be by the end of the specified period.)