Parts Assigned to Task |
The Parts Assigned to Task tab displays scheduling information for the parts required to perform tasks.
Tip: To limit the display of information in the grid and maximize performance, use the filter. You can sort on run ID, location ID, run description, and start/end date and time.
The field in the top section of this tab defines the data that the software displays.
Run ID
Numerical identifier that the system assigns to each upload. This field has a list box. The run description displays to the right of the ID.
Data in the fields in the bottom section of this tab display information about parts assigned to the task. All fields are display only.
Task number
The system's number for the task.
WO location
Identifier of the shop location assigned to the work order.
-year
Year the work order was opened.
-number
Work order number. For indirect labor, it is blank.
Equipment ID
Identifier of the equipment unit.
Task ID
Identifier of the task that describes the work.
Task IDs are defined on the Data -> Shop Activity -> Setup -> Tasks -> Primary Information screen.
Part ID
Identifier of the part needed to complete the task.
Part suffix
Number associated with the part ID, which distinguishes it from other parts with the same part ID.
Quantity
Quantity of the part needed to complete the task.
Begin date and time
Date and time (24-hour clock from 00:00 to 23:59) that the part is scheduled to be available for the task.
WO for part ID
The work order assigned to the part ID.
Part suffix
The part suffix of the part.