The Standards tab enables you to define IDs for standards to apply to equipment units in a specific class. An equipment unit’s class for standards determines which entries on this screen apply to the unit. You can specify the time required to complete a task. You also can specify the standard hours for a task by work accomplished code.

When you enter a task and a work accomplished code on the Tasks tab of the Data -> Shop Activity -> Work Order Center screen, the estimated hours default to the labor hours value from the standard labor hours by work accomplished code group on this tab. If you do not enter a work accomplished code, the estimated hours default to the labor hours value on this tab.

Detail Header

The fields in the top section of this tab define the data that displays.

Equipment class ID

Valid identifier of the equipment class to which the standard applies. This field has a list box. The class name displays to the right of the ID.

Equipment classes are defined on the Data -> Equipment Units -> Setup -> Equipment Class -> Primary Information screen.

Task or standard ID

Valid identifier of the task or standard. This field has a list box. The following choices are predefined and appropriate for standards.  

The description displays to the right of the ID.

Detail View

Data in the fields at the bottom section of this tab define the standards for the task. The system uses the information in these fields and the calculation of the current average standard time labor rate to calculate the standard value. If you specify that labor be charged at the single rate, the system uses the single average labor rate. Otherwise, it uses the average of the standard hourly rates for all employees who record their time.

Unless otherwise indicated, these fields are required.

Labor hours

Standard to apply for number of labor hours (to the nearest hundredth of an hour) required to complete one execution of the task on an equipment unit in this class for standards. Required if there is no information in the Cost per meter unit field. May be set manually or generated automatically. This field is not appropriate if the Task or standard ID field specifies MPG, GPH, MPQ, or their metric equivalents.

Generated

If this field has a check, the number of labor hours was generated automatically. This field is display only. Standards are determined on the Data -> Equipment Units -> Setup -> Equipment Class-> Standards Calculation screen.

On

Date and time (in MM/DD/YYYY HH:MM format) that the labor hours standard was calculated. This field is display only.

Proposed labor hours

You can see the proposed labor hours when they have not been applied yet.

Duration (days)

Standard for the number of days (duration) needed to complete the job. Defaults to zero (0). Maximum field length is 12 characters, including two decimal places. Must be greater than or equal to zero.

Parts cost

Standard to apply for the total expected cost of parts (provided by the vendor) that are required to complete one execution of the task on an equipment unit in this class for standards. If parts costs are applicable and there is no information in the Cost per meter unit field, a parts cost of zero is used.

Meter frequency

Number of meter units (or engine hours, as appropriate) expected to elapse between performances of the task on the same unit of equipment. Required for the system to calculate a standard if there is no information in the Cost per meter unit field.

If a meter frequency is not specified, the Labor hours field is used as the only standard.

Cost per meter unit

Standard value of the cost to perform the task, per meter unit, to the nearest tenth of a cent (three decimal places). If you leave this field blank and enter information in the Labor hours, Parts cost, and Meter frequency fields, the system calculates the cost. For the labor rate used in the calculation, see Calculation of standard labor rate.

To recalculate the cost per meter unit, clear the field and then reprocess.

Standard labor hours by work accomplished code Screen Group Data Table

The fields in the Standard labor hours by work accomplished code screen group specify the standard to apply for the number of labor hours (to the nearest tenth of an hour) required to complete one execution of a specific part of a task (work accomplished code) on an equipment unit. All fields are optional.

Fuel/fluid standards Group Data Table

The fields in the Fuel/fluid standards group data table enable you to specify fuel/fluid standards, including high and low values. These values may be used for reporting purposes, or may be used for additional MAXQueue capabilities in the future. All fields are optional.