Back | Forward

Individual PM


The Individual PM tab enables you to assign a different set of preventive maintenance (PM) services to each section of a linear asset. A linear asset can extend a significant distance and include components that require different PM programs. For example, if a linear asset included both Class I and Class II track types, you could use this tab to assign a different set of PM services to each type.

The Primary Information screen supports location-level access control, so you must belong to a user group with the applicable authorizations to make changes or updates.

Detail View Header

The field in the top section of this tab defaults from the information entered on the Basic Info tab. The field is read only.

Equipment ID

Identifier of the equipment unit currently selected in the grid. This field has a list box. The equipment unit year, manufacturer, and model display to the right of the ID.

Asset type

The type of asset.

Detail View

The data in the fields in the bottom section of this tab, presented in a screen group, define the PM services. Unless otherwise indicated, these fields are required.

Delete

To delete the entries in the fields to the right, place a check in this field and click Save.

PM service

PM service code (task ID) associated with the PM service. The maximum field length is 12 characters. This field has a list box. When you specify an equipment ID, a PM program type of INDIVIDUAL on the Basic Info tab, and an equipment class for PM program on the Classes tab, this field displays the PM service from the Individual PM Service Schedule tab on the Data -> Equipment Units -> Setup -> Equipment Class -> Primary Information screen. To define task IDs as PM services, go to the Basic Info tab of the Data -> Shop Activity -> Setup -> Tasks -> Primary Information screen.

Date last due

Last date on which this PM service was scheduled. Display only.

Date last start

Last date on which this PM service began. This field is optional.

Last performed work order

Identifier of the last work order performed. The ID consists of the identifier of the work order’s assigned shop, the year the work order was opened, and the work order number. This field is display only.

Date next due

Date of the next scheduled performance of this PM service. Required if the PM service field is populated.

Meter 1 Last due

Meter 1 reading on the asset when this PM service was last scheduled to be performed. This field is display only.

Life meter 1 performed

The life meter value at the time the the work order is finished for the PM that was performed.

Life meter 1 start

Life meter 1 reading on the asset when this PM service last began. This field is optional.

Meter 1 override

Number of meter units after the last performance of this PM service at which to perform the same service again, irrespective of elapsed time. This field is optional.

Meter 1 next due

Reading on meter 1 at which time the next PM service is due on the linear asset. This field is display only.

Number of time units

Number of time units to elapse between consecutive performances of this service on the linear asset. Each PM service has its own interval between performances. If the linear asset assigns an Equipment class for: PM program on the Classes tab, the default is the value specified on the Individual PM Service Schedule tab on the Data -> Equipment Units -> Setup -> Equipment Class -> Primary Information screen (if any). Required if the PM service field is populated.

Time unit

Measurement of time to use for the number of time units. This field has a list box: