Back | Forward

Charge Details


The Charge Details tab displays details about the charges included on work orders.

For best results, use the filter to limit the display. Choices include the following:

If you filter solely on work order location ID and do not include any other data to help identify the equipment (e.g., equipment ID, equipment type, model year, manufacturer ID, or model ID), the filter results will include data for all equipment units that have had a work order at the specified location. You can limit the display of information to other specific values to maximize performance.

The Work Order Summary screen supports location level access control, so you must belong to a user group with the applicable authorizations to make changes or updates.

You can use the sort button to select any sequence for the summary. A sequence of task-date lists the data in sequence by task ID; within each task ID, it sequences the tasks by date, with the earliest one first. This sequence conveniently groups all work in a subject area to which the inquiry pertains (group, task, or service code).

Detail View Header

The field in the top section of this tab defines the data that displays.

Equipment ID

Identifier of the equipment unit. This field has a list box of equipment unit IDs,  excluding equipment units with a check in the Exclude from inventory lists field on the Authorization tab of the Fleet Equipment screen. The equipment unit year, manufacturer, and model display to the right of the ID.

Equipment IDs are defined on the Data -> Equipment Units -> Fleet Equipment screen.

Detail View

The bottom section of this tab contains the details about the charges. All the fields are display only.

The tab includes general work order information (work order number, job status, open and close dates, job type, equipment ID, meter 1 and 2 readings, and department information), charges by task (task information and labor, parts, and vendor summaries),  part description (if parts were posted to the work order), and work order total charges for labor and parts hours and costs; vendor labor and parts; and name of the employee who posted the charges.